• 204,000 SF bottled water producing facility
• 174’ connection corridor with three conveyors carrying bottled water
from an existing building
• 20 dock doors with seals, truck restraints and levelers
• Interior partitioned with thermal insulated sandwich panels to allow
for three types of building use under the same roof
• Electronically controlled atmosphere for perfect plastic mold injection
production
• Fully conditioned control space
• Semi-heated freeze protection only, material handling, loading and
staging areas
• 60’ by 125’ 8” reinforced concrete truck apron