Before starting the new facility for JFC International, Alston had to demo the existing 50,000 SF
pharmaceutical / laboratory building that was existing on the property, formerly the home of Collagen
Corporation. Removing several concrete “Tanks” of cast off collagen sludge proved to be an interesting
project.
The Milmont Commerce Center project is a 173,286 SF state-of- the-art food storage and distribution
facility located on 9.25 acres. The project features 14,000 SF of office space, 30,000 SF freezer/cooler
space, a specialized vertical dock leveler equipment package, and back up generator. Clear height is 30’