Alston Construction/a+ Automation Integration Management (AIM)
Alston Automation Integration Management (AIM/a+) was formed to address a critical gap in the market—clients often face the challenge of managing multiple contractors for complex automation and intralogistics projects.
AIM provides a single point of contact to handle turnkey management from ground up construction through installation of fully automated systems
Supply Chain Management
Streamlining logistics, inventory, and material planning while ensuring safe handling through Alston Construction’s industry-leading safety program
General Contracting
Providing full project oversight, from scheduling to budget control, with a strong commitment to jobsite safety
Quality Control and Assurance
Implementing tailored quality plans and SOPs to maintain high standards while prioritizing worker safety
Construction Management
Delivering projects on time and within budget while ensuring a safe work environment.
Safety & Risk Management
Proactively identifying and mitigating risks to uphold the highest safety standards across all projects.
Case Studies
Our team managed the Phase 1 installation of a cutting-edge robotic system in a 960,000 SF operating warehouse with a 175,000 SF footprint. The project included two AIBs, three AOBs, one MIB, and one BOT Lift. While the general contractor handled building upgrades, AIM led the robotic installation, ensuring seamless integration. The Quality Assurance Team conducted 2,364 install validations to meet client requirements.
As our first Phase 1 system, we closely collaborated with the New Braunfels team to ensure smooth execution. This site helped develop Quality Standard Operating Procedures, improving efficiency and accuracy for future projects. The project showcased our ability to manage large-scale automation while strengthening industry partnerships.
As our first project with this repeat client, we built a strong working relationship at the site level, setting the stage for future collaboration. In Phase 2, our team successfully connected a 9-level system to the existing Phase 1 while keeping operations running. The installation included two AIBs, six AOBs, one MIB, and five FLIBs, with a night-time shutdown to incorporate new steel.
To meet the warehouse tenant’s operational needs, our team executed the FLIB mezzanine installation overnight, completing the platform in a single shift. We also streamlined inventory handling by enhancing communication and tracking with the installation teams.
Our team successfully connected a 10-level system to the Phase 1 structure while maintaining facility operations. The installation included two AIBs, six AOBs, one MIB, five FLIBs, and two drain lines, with a strategic night-time shutdown to incorporate new steel. The Quality Assurance Team conducted 3,318 install validations, achieving a 100% completion rate.
To overcome limited laydown space, we used rock instead of asphalt, ensuring a safe, smooth area by collaborating with the general contractor. When material deliveries accelerated, we adjusted by using Product Aisle space for front-end equipment. Our team also helped resolve a design flaw with the main product transfer point, staying over 30 days past de-mobilization to ensure a proper solution. The engaged site owner and successful FLIB install marked key milestones, demonstrating our adaptability and collaboration in meeting client needs while maintaining seamless operations.
AIM successfully completed Phase 1 installation of a 10-level system, including AIBs, AOBs, Drain Lines, and MIBs in a fully operating facility. Despite occasional material shortages, the team ensured smooth progress through excellent communication and daily calls. AIM’s Quality Assurance Team conducted 2,906 install validations, ensuring accuracy per client requirements.
AIM provided valuable on-site guidance, proactively addressing inventory concerns by placing additional orders. Despite challenges, Quality Assurance and Control remained a priority, with a strategic approach increasing the validation acceptance rate by 28.2% over our first site. The tenant’s GC was highly engaged, fostering strong collaboration. The team’s adaptability ensured a successful installation, setting a strong foundation for future phases.






FOR MORE INFORMATION, PLEASE CONTACT:
Scott Picard | Vice President & General Manager
713.865.2128
SPicard@alstonco.com
April Parham | Quality Assurance Manager
832.984.7179
AParham@alstonco.com
Haleem Iddriss | Supply Chain Manager
713.208.9793
hiddriss@alstonco.com