Category: News

Dignity Health MOB

This project is expected to break ground in March 2017, with anticipated completion by January 2018. The 68,727 SF three-story concrete tilt, structural steel frame, concrete over metal deck, cold shell building is located on a 4-acre site in the heart of Citrus Heights, CA. The exterior features consist of a 60mil TPO roof membrane, aluminum panel roof screens, clear anodized [...]

McCarthy Creekside

Phase 1 – Demolition completed September 2016. Site grading for the 3 buildings (A, F & B) started in December 2016. The off site, site improvements and buildings continue in the design and permitting phase. Permits are expected in mid February, 2017 Buildings A, F, B – 3 buildings, 22 acre site: Bldg A – […]

BMW Expansion

This project broke ground July 5, 2016, with anticipated completion April 2017. The 185,000 SF concrete tilt expansion at the existing 250,000 SF parts distribution facility is located on a 18-acre site at the Stockton Airport Gateway Center. This expansion features 185,000 SF of new storage space, a new exterior dock apron to collect and […]

Loomis Armored Car

The project is currently in design, groundbreaking is expected to be May, 2017 and be complete early 2018. The Loomis Armored Car project is a terminal shell and is a 45,646 SF single story, site cast concrete tilt-up facility.

Gateway 80 Buildings

Building B substantial completion scheduled for March 2017.  Building A footings, slab and panels currently in progress. Gateway 80 is a 861,000 SF industrial project located in Fairfield, CA and has 2 buildings/ Building A is 36’ clear, building B is 32’ clear.  Roof structure is hybrid roof with steel trusses and wood deck.  Slabs […]

DBI Beverage Distribution Facility

DBI Beverage is a 166,062 sf concrete tilt building located on a 10-acre site in the southeast San Jose area, with a 34’ clear height, 13 dock positions with exterior canopies covering 12,000 SF of loading dock area.The climate-controlled warehouse features insulated concrete panels, wood and steel hybrid roof structure designed to support a 1.1 […]

FedEx Ground

197,000 SF tilt construction distribution facility,10,000 SF office on an 8 acre site. The project has 700 lineal feet off site improvements, an access road and concrete bridge across slough to site, with a 15 acre development for future expansion. Located in Watsonville, CA.

Medline Industries

Medline is a 1,007,352 SF tilt building located in Tracy on a 57 acre site. The project features 37’ clear height, 24,000 SF office space, a metal deck with above deck insulation with a 60mil TPO roof membrane. Parking for 378 auto stalls and 272 truck stalls.

Beard Warehouse A

The warehouse is a 476,580 SF, 36’ clear, tilt construction project located in Modesto, CA. The project features a wood and steel hybrid roof structure with a 60 mil TPO roof over R-19 rigid insulation and has a cross dock configuration and ESFR fire protection. Also includes “air bag” dock levelers at 36 locations and […]

Southport Business Park Buildings K & L

K = 138,455 SF, 30’ clear, hybrid roof, is 60 mil TPO, 25 dock doors, 2 GL doors, ESFR Fire Sprinklers w/shared pump. 2,000 Amp electrical service. Up to 21,000SF of Office space, 40 trailer parking stalls.L = 153,830 S SF, 30’ clear, hybrid roof, 4 ply BUR roofing, 30 dock doors, 2 GL doors, […]