Gateway 80 Buildings

Building B substantial completion scheduled for March 2017.  Building A footings, slab and panels currently in progress.

Gateway 80 is a 861,000 SF industrial project located in Fairfield, CA and has 2 buildings/ Building A is 36’ clear, building B is 32’ clear.  Roof structure is hybrid roof with steel trusses and wood deck.  Slabs are 7” thick with #4 rebar at 18” on center each way.  Buildings A & B each have 84 dock doors and 4 grade-level doors.  Both buildings have ESFR fire sprinkler systems and 4,000 amp electrical service.  The overall site is 52 acres.  The site will be entirely paved in concrete.